
special hazards solutions
Ameren UE Hydroelectric Plant - Keokuk, Iowa


Type of Project
Retrofit existing transformers
Owner
Ameren
The Challenge
The plant is not manned at all times so equipment protection is a priority. Installing a new cycling valve provided better protection to the fire pump.
The McDaniel Difference
Designing a solution that addressed problematic installation challenges and improved system performance and efficiency.






